Proposed Phang Nga–Krabi railway could reach Krabi airport by 2039
- 1A proposed 67.421 km railway would link Thap Put with Krabi International Airport.
- 2Plans include five stations and three additional stops.
- 3The line is still being studied, with service targeted for 2039.
The State Railway of Thailand is studying a 67.421 km route from Khok Charoen in Thap Put district, Phang Nga, to Krabi International Airport. The proposed line would give travellers another way to reach Krabi and its airport.
Plans include five stations at Khlong Hin, Khao Khram, Ao Luek, Krabi and Krabi International Airport, plus stops at Na Nuea, Khao Yai and Ban Klang. The railway is still at the study and public consultation stage.
The current timetable calls for construction approval in 2030, tendering in 2033 and work to begin in 2034. Service is expected to start in 2039 if the project proceeds as planned.




