All news
Getting around · Bangkok

Bangkok Orange Line targets public trial rides in December 2027

Public trial rides on Bangkok’s Orange Line between Thailand Cultural Centre and Min Buri are targeted for December 2027, with the first train expected in November 2026.

Thai PostTranslated from Thai

Bangkok’s eastern Orange Line section is being prepared for public trial rides in December 2027. The 22.5-kilometre route will connect Thailand Cultural Centre with Min Buri (Suwinthawong), serving 17 stations: 10 underground and seven elevated.

The first train is expected to arrive in November 2026, with all 16 trains for the eastern section due by mid-2027. Railway systems installation and testing must take place before passengers can take part in the trial. December 2027 remains a target.

The western section, between Bang Khun Non and Thailand Cultural Centre, was 38.50% complete at the end of October 2026. It will add 13.4 kilometres and 11 underground stations, bringing the full east–west route to 35.9 kilometres.

At Democracy Monument station on Ratchadamnoen Klang Road, construction will use an underground steel-pipe roof to reduce the need to dig up the road surface. The method is intended to limit traffic diversions and disruption in Bangkok’s historic Rattanakosin area.

Original story
Read it on Thai Post (in Thai)
Translated and condensed automatically by Phuket Tourist. Check the original for full details.

More news

All news